Monday, March 1, 2010

Rehab 4470 Starts on Monday

We close on the next home renovation property on Monday.  We received the HUD 1 last week with no real surprises and have already set up the utilities transfer and insurance.  There's a walk through on Monday morning and assuming the house has not burned down we'll close in the afternoon.  Then the fun starts to get the property back on the market in 8 weeks.

With this renovation we have the following plans so stayed tuned for lots of pictures:

Master Suite
  • Bedropom carpet replaced with wood (bamboo) or tile (20")
  • Wall paper removed from bedroom and bath
  • Millwork around Sliding glass doors in bedroom
  • Paint throughout / gloss white on Trim
  • Linoleum removed from bath and tiled (20" tile)
  • New vanity in batch (96") with granite counter
  • Ceiling fan in Bedroom
  • Tile replaced in WC (20")
  • Windows trimed out with Millwork
Living Room / Den
  • Carpet replaced with hardwood (bamboo)
  • Paint throughout / gloss white on Trim
  • Millwork around sliding glass doors
  • Windows trimed out with Millwork
  • Ceiling fans replaced
Kitchen / Dining Room
  • Wall between kitchen and Dining Room cut down to counter height.  Electic moved.
  • Wallpaper removed in dining and kitchen
  • New kitchen cabinets with granite counters and new sink
  • Tile kitchen backsplash
  • New Stainless Steel appliances
  • New light in Dining Room
  • Possilbly replace kitchen and dining room tile (20")
  • Windows trimed out with Millwork in dining room
  • Paint throughout with gloss white trim and baseboards
Bedroom
  • Bedropom carpet replaced with wood (bamboo) or tile (20")
  • Paint throughout with gloss white trim
  • Trim out window
  • Replace ceiling fan
Hallway Bath
  • Replace linoleum with tile (20")
  • Remove wallpaper
  • Paint throughout with gloss white trim
  • New vanity with granite
  • Picture frame mirror
Exterior
  • Replace rotted wood
  • Paint Exterior including soffits
  • Remove all current landscape before painting
  • New plants and outdoor lighting upgrade following paint
  • New house numbers
  • Replace entryway tile (maybe)
  • Fix / Replace broken screens
  • Seal driveway

No comments: